 Due to the ground conditions, extra depth foundation pads were dug and trench filled to the top with reinforced concrete. |
 A new infill slate roof was constructed to accommodate the structural box gutter system. |
|
 The steel system being erected. |

|
 The strength of the structure box gutter shown during glazing of the roof. |
|
 Fully insulated basement giving access from lower bedroom to existing laundry area. |

|
 Completed with decking and a stairway to the garden area. |